United Brotherhood of Carpenters – International Training Center
Market | Commercial | Professional | Office, Education - Higher Education | Post-Secondary
Two-story, 222,000 SF addition includes more than 50 tilt-up concrete panels which make up the primary structure, the largest panel weighing more than 259,000 pounds and standing 52-feet tall. The second floor of the Center, built with structural steel and slab-on-metal-deck, contains classrooms, two large meeting halls with movable wall partitions, and a break room, as well as an underwater drilling tank.
A unique challenge on this project was precast panel coordination and installation of the 30’ x 60’ retractable roof in the shop area – essentially a large state-of-the-art working classroom with two overhead gantry cranes.
Location: Las Vegas, NV
Project Size: 222,000 SF
Designer: Carlisle Coatsworth Architects
Delivery Method: Construction Management at Risk (CMAR)
Designer: Carlisle Coatsworth Architects