UNLV Rogers Administrative Building

Market | Education - Higher Education | Post-Secondary

Our team’s primary goal while renovating the four-story, 20-year-old Rogers Administration and Justice (RAJ) Building was to focus on long-term solutions that would best benefit UNLV. PENTA identified repairs that needed to be made to avoid additional costs in the future. These included minor electrical work and an overhaul of the heating, ventilation, and air conditioning (HVAC) system. On the first and second floors, PENTA installed an innovative and eco-friendly DIRTT wall system, providing tenants the flexibility to shift the functionality of the room with zero damage to the interior. To allow more natural light, PENTA installed additional windows and glass walls. In addition to modernizing the interior space and completing mechanical and plumbing on the third and fourth floors, PENTA expanded the exterior envelope by 800 SF. The expanded space provided two common areas for students and faculty to participate in informal meetings and collaboration with colleagues.

 

Prior to demolishing the first two floors and their systems, we mitigated the effect this would have on the upper two floors by spending four weeks tracing and identifying every wire, duct, and fire sprinkler line, and ensuring none of the systems for the third and fourth floors were demolished. During active construction, PENTA provided advance notice to the facility’s more than 100 faculty members for any significant construction efforts that would impact their routines.

Location: Las Vegas, NV
Project Size: 52,297 SF
Designer: Simpson Coulter Studio
Delivery Method: Construction Management at Risk (CMAR)
Designer: Simpson Coulter Studio

Project Gallery

Related Projects

Cal State University Long Beach – Task Order Projects 011

Long Beach, CA

Cal State University Long Beach – TOCA 009 MSX East Campus

Long Beach, CA

Cal State University Long Beach – University Student Union Renovation & Expansion

Long Beach, CA

Scroll to Top